| 01 | Profile A | Automotive interior and exterior trim | CNC roughing and finishing Vacuum-channel integration Replaceable wear inserts Temperature-control routing | Cast aluminum P20 pre-hardened steel Copper-alloy inserts | Approximately ±0.02–0.05 mm on critical machined features | CMM dimensional inspection Surface-profile scanning Vacuum-leak testing First-article approval | ISO 9001 IATF 16949 PPAP | 10–20 working days |
| 02 | Profile B | Food packaging and disposable containers | High-speed CNC machining Fine vent-hole drilling Multi-cavity alignment Quick-change cutting inserts | Aluminum alloy Stainless steel for selected inserts Hardened tool steel | Approximately ±0.03–0.08 mm for cavity and plug-assist components | Optical measurement Cavity-to-cavity comparison Vent-depth verification Trial forming evaluation | ISO 9001 ISO 14001 Food-contact material review | 8–18 working days |
| 03 | Profile C | Medical trays and laboratory packaging | High-polish cavity finishing Controlled-radius transitions Precision vacuum distribution Cleanable assembly design | Aluminum alloy 1.2316 stainless mold steel Hardened stainless inserts | Approximately ±0.02–0.05 mm on sealing and forming surfaces | CMM inspection Roughness measurement Visual defect inspection Seal-area verification | ISO 9001 ISO 13485 Traceability procedures | 12–25 working days |
| 04 | Profile D | Consumer electronics housings | 5-axis CNC contouring Electrode-free finishing where possible Fine texture replication Modular cavity construction | 718H steel P20 steel Aluminum for prototype molds | Approximately ±0.015–0.04 mm on cosmetic and mating features | 3D optical scanning CMM measurement Texture comparison Assembly-fit testing | ISO 9001 RoHS material control Cosmetic inspection criteria | 12–22 working days |
| 05 | Profile E | Agricultural and industrial equipment panels | Large-format CNC machining Reinforced mold-base assembly Replaceable drilling plates Zoned vacuum manifolds | Cast aluminum Welded steel base P20 or 718H inserts | Approximately ±0.05–0.12 mm for large-format mold features | Portable CMM or laser tracker Flatness measurement Vacuum-flow testing Mold-base alignment checks | ISO 9001 ISO 45001 Welding procedure control | 15–30 working days |
| 06 | Profile F | Refrigerator liners and appliance components | Large-cavity machining Thermal expansion compensation Integrated cooling channels Reinforced support structures | Cast aluminum Steel reinforcement frame Stainless cooling components | Approximately ±0.05–0.10 mm for cavity geometry and mounting points | CMM and laser scanning Cooling-circuit pressure test Wall-thickness trial check Full-size assembly inspection | ISO 9001 ISO 14001 Process capability monitoring | 18–35 working days |
| 07 | Profile G | Logistics trays and reusable packaging | Multi-cavity balancing Hardened guide systems Automated vent machining Easy-maintenance insert design | Aluminum alloy S50C or equivalent mold-base steel Hardened tool-steel wear inserts | Approximately ±0.04–0.10 mm for repeated cavity features | Gauge inspection Cavity repeatability checks Trial production sampling Drop and stacking fit checks | ISO 9001 FMEA Control plan | 10–24 working days |
| 08 | Profile H | Sanitary products and bathroom components | High-gloss polishing Controlled draft-angle design Uniform vacuum-channel layout Corrosion-resistant insert assembly | 1.2316 stainless mold steel Aluminum alloy Chrome-molybdenum wear inserts | Approximately ±0.03–0.08 mm on visible forming surfaces | Gloss and surface inspection CMM dimensional checks Draft-angle verification Water-flow and vacuum tests | ISO 9001 ISO 14001 Surface-finish specification | 12–28 working days |
| 09 | Profile I | Protective packaging for industrial products | Rapid-prototype mold construction Modular cavity plates CNC drilling and routing Low-volume tooling optimization | Aluminum alloy Epoxy tooling board for prototypes Mild-steel support bases | Approximately ±0.08–0.15 mm for prototype and low-volume tooling | CAD-to-part comparison Manual gauge checks Trial forming inspection Packaging-fit validation | ISO 9001 Prototype approval report Dimensional control plan | 5–15 working days |
| 10 | Profile J | High-temperature engineering plastic parts | Heat-resistant mold design Thermal-cycle simulation Precision venting Interchangeable hardened inserts | H13 or equivalent hot-work steel 1.2316 stainless steel Aluminum for non-production prototypes | Approximately ±0.02–0.06 mm on critical thermal-forming features | CMM inspection Thermal-cycle testing Hardness verification Surface-profile measurement | ISO 9001 ISO 45001 Material certificates | 15–30 working days |