| Supplier Profile 01 | DN200–DN1200 OD 219–1220 mm | 3.0–5.0 mm | UNS N06625 Alloy 825 | Strip cladding with submerged arc welding | Typically below 10% | 100% visual and dimensional inspection; 100% PT on overlay surface; UT on pipe body and weld areas | ASTM B423, ASTM B705, ASME Section IX | 8–12 weeks | Excellent |
| Supplier Profile 02 | DN150–DN1000 OD 168–1016 mm | 3.0–4.5 mm | Alloy 625 Alloy 59 | Automatic strip overlay welding | Approximately 8–12% | PT and UT inspection; ferrite or chemical composition checks where required; weld procedure qualification | API 5L, ASME B31.3, ASME Section IX | 8–14 weeks | Excellent |
| Supplier Profile 03 | DN250–DN1400 OD 273–1420 mm | 3.5–5.0 mm | Alloy 625 Alloy 825 Duplex-compatible overlays | SAW strip cladding and circumferential overlay welding | Typically below 12% | Radiographic or ultrasonic testing of longitudinal welds; PT of clad surface; hardness mapping | API 5LD, ASTM G48, ASME Section VIII | 10–16 weeks | Very Good |
| Supplier Profile 04 | DN100–DN800 OD 114–813 mm | 3.0–4.0 mm | Alloy 625 Alloy 825 316L overlay | GTAW root layer with automated SAW overlay | Approximately 10–15% | 100% PT after machining; UT thickness mapping; dimensional inspection and PMI available | ASTM A265, ASTM B898, ASME Section IX | 6–10 weeks | Very Good |
| Supplier Profile 05 | DN200–DN1500 OD 219–1524 mm | 3.0–5.0 mm | Alloy 625 Alloy 686 Nickel-based corrosion-resistant alloys | High-speed strip cladding with controlled heat input | Typically below 10% | UT, PT, PMI, macro examination and corrosion testing according to project specification | API 5L, NACE MR0175/ISO 15156, ASME Section IX | 12–18 weeks | Excellent |
| Supplier Profile 06 | DN150–DN900 OD 168–914 mm | 3.0–4.5 mm | Alloy 625 Alloy 825 316L | Automatic SAW overlay on longitudinally welded pipe | Approximately 10–14% | 100% weld visual inspection; UT for lack of fusion; PT for surface-breaking defects; hardness testing | ASTM A671, API 5LD, ASME B31.1 | 8–12 weeks | Very Good |
| Supplier Profile 07 | DN300–DN1800 OD 324–1829 mm | 4.0–5.0 mm | Alloy 625 Alloy 825 Super duplex overlay systems | Multi-layer strip cladding for heavy-wall pipe | Typically below 12% | Full-length UT and PT; weld seam radiography where specified; overlay thickness mapping and bend testing | API 5L, ASTM G48, NACE MR0175/ISO 15156 | 12–20 weeks | Excellent |
| Supplier Profile 08 | DN80–DN600 OD 89–610 mm | 3.0–4.0 mm | Alloy 625 Alloy 825 904L | GTAW or GMAW overlay for small and medium diameters | Approximately 12–18% | PT, UT, chemical analysis, hardness testing and weld bead visual examination | ASTM B862, ASME Section IX, ASME B31.3 | 6–10 weeks | Good |