| Integrated façade fabricators | May coordinate engineering, fabrication, glazing, unit assembly, packing, and installation support as one package. | Projects requiring coordinated façade engineering and a defined interface between design, production, and site work. | For projects in China, check the applicable requirements of GB/T 21086-2007, Curtain Wall, together with project-specific building codes and specifications. | Confirm which activities are performed in-house, which are subcontracted, and who is responsible for design coordination and site installation. |
| Unitized system specialists | Focus on factory-assembled façade units designed for transport and installation as prefabricated panels. | Projects where panelized installation, repetitive floor layouts, or reduced on-site assembly are priorities. | Ask for project-relevant air, water, and structural test reports. ASTM E283/E283M addresses air leakage; ASTM E331 addresses water penetration under static pressure; ASTM E330/E330M addresses structural performance under uniform static air pressure. | Check that tested specimens represent the proposed unit joints, anchors, glass build-up, seals, and design pressures—not merely a similar system. |
| Stick-built system fabricators | Supply or fabricate mullions, transoms, infill, and related components that are commonly assembled on site. | Projects with varied façade geometry, phased construction, or site-specific assembly requirements. | Use the project specification to define air leakage, water penetration, structural loading, and test conditions; ASTM E283/E283M, E331, and E330/E330M are commonly referenced test methods. | Review installation tolerances, connection details, drainage paths, sealant joints, and the proposed field quality-control plan. |
| Industrial and performance-envelope specialists | May develop façade packages around particular requirements such as large spans, impact resistance, acoustic control, or demanding exposure conditions. | Factories, logistics facilities, public buildings, and other projects where envelope performance must be matched to the site and building use. | For European projects, EN 13830 is the product standard for curtain walling. Confirm the edition, conformity route, and project jurisdiction with the design team. | Request performance evidence for the actual configuration, including any special infill, opening units, corners, and transitions to adjacent construction. |
| Component-focused suppliers | Provide defined parts or services, such as aluminium framing, glass processing, hardware, gaskets, anchors, or engineering assistance. | Projects where the façade contractor or project team manages system integration and procurement across multiple packages. | Component specifications and test evidence should be assessed against the complete façade design and applicable project requirements. | Confirm material grades, finish, dimensional tolerances, compatibility with adjacent materials, traceability, and responsibility for system-level performance. |
| Cross-segment procurement criteria | Supplier capability is best compared through scope, technical evidence, production controls, delivery planning, and after-sales obligations—not category name alone. | Applicable to both domestic Chinese projects and export projects, subject to local codes and contract requirements. | Set project-specific targets for air and water performance, structural loads, thermal and acoustic performance, fire requirements, and durability; do not treat a test method as a performance rating. | Compare like-for-like drawings, bill of materials, test scope, warranty terms, quality records, capacity, lead time, packaging, and installation responsibilities. |