| 1 | Supplier 01 | Not independently verified; tolerance is drawing- and process-specific. | Not independently verified; depends on material, press conditions, maintenance, and die design. | Quote-specific; no verified figure available. | Not independently verified. | Signed capability report, inspection results, tool-life definition, project schedule, and service locations. |
| 2 | Supplier 02 | Not independently verified; request tolerances for critical features. | Not independently verified; request production history for comparable parts. | Quote-specific; confirm design, build, tryout, and shipping milestones. | Not independently verified. | Part-specific tolerance statement, reference projects, milestone plan, and support response terms. |
| 3 | Supplier 03 | Not independently verified; must be assessed against the part drawing and measurement method. | Not independently verified; clarify whether the estimate means strokes, parts, or service intervals. | Quote-specific; depends on scope and approval timing. | Not independently verified. | Measurement plan, tool-life basis, scope breakdown, and regional maintenance capability. |
| 4 | Supplier 04 | Not independently verified; no comparable public specification supplied. | Not independently verified; material grade and maintenance schedule affect life. | Quote-specific; obtain a dated schedule with stated assumptions. | Not independently verified. | Capability documentation, material assumptions, schedule, and warranty or service conditions. |
| 5 | Supplier 05 | Not independently verified; confirm acceptance criteria for each critical feature. | Not independently verified; request evidence from comparable production applications. | Quote-specific; separate engineering, fabrication, tryout, and delivery. | Not independently verified. | Inspection records, comparable tool references, phase-by-phase lead time, and support contacts. |
| 6 | Supplier 06 | Not independently verified; performance cannot be inferred without part and process details. | Not independently verified; specify operating conditions and maintenance assumptions. | Quote-specific; confirm capacity and customer approval dependencies. | Not independently verified. | Process capability evidence, operating assumptions, capacity confirmation, and service coverage map. |
| 7 | Supplier 07 | Not independently verified; request measured results rather than a general capability claim. | Not independently verified; define the failure or refurbishment threshold used. | Quote-specific; include shipping and commissioning where applicable. | Not independently verified. | Measured part data, tool-life criteria, delivery scope, and commissioning or repair arrangements. |
| 8 | Supplier 08 | Not independently verified; tolerance capability is feature- and process-dependent. | Not independently verified; request documented results for similar materials and volumes. | Quote-specific; ask for a committed schedule and change-control process. | Not independently verified. | Feature-level capability results, comparable production records, schedule commitment, and escalation process. |
| 9 | Supplier 09 | Not independently verified; agree on inspection method and acceptance limits before ordering. | Not independently verified; die life varies with use and upkeep. | Quote-specific; confirm tooling, sampling, and approval dates. | Not independently verified. | Inspection agreement, maintenance plan, approval schedule, and local or remote support terms. |
| 10 | Supplier 10 | Not independently verified; require a written, part-specific capability commitment. | Not independently verified; compare only when the life basis and conditions match. | Quote-specific; verify current workload and delivery assumptions. | Not independently verified. | Written capability commitment, comparable tool-life basis, current schedule, and service references. |