| 1 | SMT placement | Automated pick-and-place equipment, feeders, and component handling systems | Confirm support for the project’s component sizes, package types, placement accuracy, and required production volume. Ask how fine-pitch and small passive components are handled. | Equipment capability summary, sample placement records, and a review of the actual bill of materials (BOM). |
| 2 | PCB assembly range | SMT, through-hole, mixed-technology, and single- or double-sided assembly processes | Verify that the assembler can build the board’s layer-related assembly requirements, dimensions, panel format, and combination of component technologies. | Documented process capabilities and confirmation that the board files and panel design are suitable for the production line. |
| 3 | Solder paste printing | Stencil printers, solder paste inspection, and controlled paste storage and handling | Ask how stencil alignment, paste volume, environmental conditions, and paste shelf life are monitored. Check whether inspection is performed before placement. | Printer setup procedure, inspection examples, and records for paste storage, thawing, and use. |
| 4 | Reflow and soldering | Reflow ovens, wave or selective soldering equipment, and temperature profiling tools | Confirm that profiles can be developed for the board and component mix, including thermal limits for sensitive parts and any lead-free process requirements. | Example thermal profiles, process-control records, and the method used to verify solder-joint quality. |
| 5 | Inspection coverage | Automated optical inspection (AOI), X-ray inspection, and manual inspection where appropriate | Determine which inspections are used for visible solder joints, hidden joints such as bottom-terminated packages, polarity, alignment, and component presence. | Inspection plan, sample reports, defect classification rules, and procedures for resolving false calls. |
| 6 | Fine-pitch and advanced packages | Process controls for fine-pitch leads, ball-grid arrays, chip-scale packages, and other challenging packages | Ask whether the assembler has a defined process for the specific package types on the BOM, including suitable inspection and rework methods. | Relevant process documentation, anonymized inspection examples, and a discussion of package-specific risks. |
| 7 | Test and functional verification | In-circuit test, flying-probe test, boundary-scan support, and functional test | Check whether the proposed test approach matches the board’s test points, access constraints, firmware needs, and required coverage. | Test strategy, fixture or program development plan, sample test report, and test-failure handling procedure. |
| 8 | Rework and repair | Controlled component removal, replacement, soldering, and post-rework inspection processes | Confirm that rework is suitable for the package and board construction, and that repaired assemblies are inspected and recorded. | Written rework procedure, operator qualification records, and examples of repair traceability documentation. |
| 9 | Process control and traceability | Documented work instructions, lot tracking, equipment maintenance, and calibration controls | Verify that materials and assembly lots can be traced through production and that process changes, nonconformances, and corrective actions are documented. | Sample traveler or traceability report, calibration schedule, maintenance records, and corrective-action workflow. |
| 10 | Capacity and engineering support | Production-line capacity, engineering review, prototyping, and design-for-manufacturing feedback | Assess whether the assembler can support the expected mix of prototype, pilot, and repeat production work, with capacity and lead times suited to the schedule. | Capacity plan, sample design-for-manufacturing review, escalation contacts, and a clear production ramp plan. |