| Legal identity | Registered business details and authorized signatory | Legal name, registration number, operating address, and contracting entity are consistent across records. | Current business registration extract, tax details where applicable, and signatory authorization. | Check records with the relevant official registry; name the verified legal entity in the agreement. |
| Product specification | Materials, dimensions, color, tolerances, labeling, and packaging | Every order references an approved, dated specification and revision. | Technical data sheet, drawings or samples, inspection plan, and written list of included components. | Attach the approved specification to the agreement; require written approval before any change. |
| Quality management | Documented quality controls and corrective-action process | Supplier can show inspection records, nonconformance handling, and corrective-action follow-up. | Quality manual or process summary, recent audit findings, sample inspection report, and corrective-action log. | If ISO 9001 certification is claimed, verify certificate scope, status, and certification body; certification alone does not prove product conformity. |
| Regulatory compliance | Requirements applicable to product composition, use, and destination market | A written compliance matrix identifies each applicable rule, test, exemption, and responsible party. | Relevant test reports, declarations, material disclosures, and supporting technical documents. | Check report dates, product/model scope, methods, and issuing laboratory. Confirm whether rules such as EU REACH or RoHS apply to the specific product and market. |
| Traceability | Lot or batch identification and production records | Finished goods can be linked to production date, batch, and inspection results. | Example label, batch record, production traveler, and traceability or recall procedure. | Define required lot coding, record-retention period, and notification time for a safety or quality incident. |
| Capacity and lead time | Confirmed output, order minimums, and replenishment schedule | Capacity and lead time are stated in writing and supported by recent production or delivery records. | Capacity plan, production calendar, stated minimum order quantity, and recent on-time delivery data. | Set order confirmation, delivery milestones, delay notice, and recovery-plan requirements. |
| Performance targets | On-time delivery and defect rate | Suggested starting targets: at least 95% on-time delivery and no more than 1% defects, adjusted to product risk and baseline performance. | Monthly or quarterly shipment and inspection summaries for the previous 6–12 months, where available. | Define calculation methods, reporting frequency, sampling rules, corrective actions, and review thresholds in the agreement. |
| Independent testing | Product tests matched to specification and legal requirements | Testing is performed using a suitable method by a competent laboratory when independent testing is needed. | Complete test report showing sample identity, test method, date, results, and laboratory details. | Confirm the tested sample represents the supplied product; specify retesting triggers after material or process changes. |
| Subcontracting and sourcing | Disclosure of critical subcontractors and material sources | Supplier identifies outsourced processes and obtains approval before significant changes. | Process-flow overview, subcontractor list for critical operations, and change-control procedure. | Set prior-notice and approval requirements for changes to materials, manufacturing site, or critical subcontractors. |
| Commercial terms | Price, currency, payment, shipping terms, and order acceptance | Each term is unambiguous, including responsibility for freight, insurance, customs, and import documentation. | Formal quotation, price-validity period, payment schedule, and delivery-term proposal. | State the agreed Incoterms® rule and named place, where applicable; define invoice, payment, and price-change procedures. |
| Risk and remedies | Nonconforming goods, late delivery, warranty, and recall cooperation | Responsibilities and response times are set before the first purchase order. | Warranty policy, returns process, incident-response procedure, and insurance information where relevant. | Agree on inspection and rejection windows, replacement or refund options, corrective-action deadlines, and recall cooperation. |
| Supplier review | Ongoing performance and compliance review | Review delivery, defects, open corrective actions, and document validity at least quarterly during initial sourcing. | Performance scorecard, updated certificates or declarations, and records of closed corrective actions. | Set review cadence, audit access, escalation steps, and suspension or termination conditions in the agreement. |