| Conveyor dimensions | Widths, lengths, sections, and connection points | Check whether the supplier offers standard modules as well as cut-to-length sections. Confirm usable conveying width, overall width, support spacing, and how straight, curved, and merge sections connect. | Request dimensioned layout drawings and confirm interface dimensions before production. |
| Roller selection | Material, diameter, pitch, and bearing type | Common choices include steel or plastic rollers, with roller pitch selected to support the smallest package. As a practical rule, a rigid load should generally rest on at least three rollers at once; verify this against the load and conveyor design. | Provide the smallest package footprint, load shape, operating environment, and required load capacity. |
| Frame and finish | Construction materials and environmental suitability | Compare painted or powder-coated steel for general industrial areas with stainless-steel components where washdown, moisture, or corrosion resistance is important. Material suitability depends on cleaning chemicals and exposure conditions. | Ask for material specifications, finish details, and written confirmation of suitability for your cleaning process. |
| Accessories and layout | Supports, guides, stops, curves, and transitions | Customization may include adjustable-height legs, side guides, end stops, ball-transfer sections, and curved modules. Gravity flow depends on load characteristics, roller condition, and incline; establish the required slope through testing or supplier engineering review. | Request a complete layout, a list of included accessories, and a trial or validation plan for difficult loads. |
| Load and application fit | Unit-load weight, base, and operating conditions | Capacity must be checked for the complete conveyor section and load distribution—not just an individual roller. Cartons, totes, trays, and rigid-bottom pallets can behave differently on the same roller pitch. | Share maximum and typical load weights, dimensions, bottom-surface details, throughput, and any impact or accumulation requirements. |
| Delivery time | Stock, configured, and engineered-to-order lead times | For initial planning only, a stock or lightly configured order may take roughly 1–3 weeks; a configured order about 3–6 weeks; and a more customized or engineered order about 6–12 weeks or longer. Availability, order size, approvals, and shipping can materially change these ranges. | Obtain a dated schedule that separates drawing approval, fabrication, dispatch, transit, and installation or commissioning. |
| After-sales support | Troubleshooting, service access, and response commitments | Support may include remote troubleshooting, replacement-part supply, maintenance guidance, and on-site service where available. Response times and service coverage are supplier-specific and should be agreed in writing. | Confirm support hours, contact channels, escalation process, geographic coverage, and any service fees. |
| Warranty and spare parts | Coverage, exclusions, and parts availability | Warranty terms differ by component and supplier. Common wear items can include rollers, bearings, and retaining components; availability depends on whether dimensions and parts are standardized. | Review the written warranty, start date, exclusions, replacement process, and recommended critical-spares list. |
| Documentation and handover | Drawings, operating guidance, and maintenance information | A useful handover package can include approved layout drawings, component details, assembly instructions, safe-use guidance, and maintenance recommendations appropriate to the supplied equipment. | List required document formats and languages in the RFQ and confirm which documents are included before order placement. |