| Small booster or domestic water pump | 5–15 m³/h | 20–45 m | 2.2 kW | Approximately 4.8–5.2 A | 2.2 kW inverter, subject to current rating | At least the motor nameplate current | 120% for 60 seconds or equivalent pump-duty rating | Use a pressure sensor or transducer for constant-pressure control. Confirm that the inverter supports the motor voltage and feedback signal. |
| Irrigation or light commercial transfer pump | 15–35 m³/h | 25–60 m | 5.5 kW | Approximately 11–12 A | 5.5 kW inverter, subject to current rating | At least 12 A continuous at the selected ambient temperature | 120% for 60 seconds; higher overload may be required for high-inertia loads | Check pipe friction, static head, dry-run protection, minimum frequency, and the pump manufacturer's minimum flow requirement. |
| Agricultural irrigation or process circulation | 30–70 m³/h | 35–80 m | 11 kW | Approximately 22–24 A | 11 kW inverter, subject to current rating | At least 24 A continuous, with derating applied where necessary | 120–150% for 60 seconds, depending on acceleration and load inertia | Use a ramp time that prevents water hammer. Select sensorless vector or closed-loop control when stable low-speed torque is important. |
| Municipal water supply or large booster set | 60–150 m³/h | 40–100 m | 22 kW | Approximately 43–47 A | 22 kW inverter, subject to current rating | At least 47 A continuous after temperature, altitude, and enclosure derating | 120% for 60 seconds or the manufacturer's heavy-duty rating | Evaluate bypass operation, redundant pumps, sleep and wake functions, pressure-loss detection, and automatic restart requirements. |
| High-capacity industrial water or cooling system | 120–300 m³/h | 45–120 m | 45 kW | Approximately 86–92 A | 45 kW inverter, subject to current rating | At least 92 A continuous after all applicable derating | 150% for 60 seconds where starting torque or system inertia requires it | Check harmonic limits, motor cable length, output reactor requirements, cooling conditions, and the availability of a suitable maintenance bypass. |
| Deep-well or high-pressure process pump | 20–100 m³/h | 100–300 m | 75 kW | Approximately 140–155 A | 75 kW inverter, subject to current rating | At least 155 A continuous after derating | 150% for 60 seconds or according to the motor and pump starting requirements | Verify submersible-motor cooling flow, permissible minimum frequency, motor cable capacitance, insulation stress, and maximum allowable starts per hour. |