| Protective earth and bonding | Inspect enclosure bonds; measure continuity from the protective-earth terminal to accessible conductive panels. | Connections are secure, corrosion-free, and meet the specified bond-resistance requirement. | 0.08 Ω measured; bonding points secure. | Pass |
| Cable routing and separation | Inspect the installed layout; separate motor and switching cables from low-level control and sensor wiring where practicable. | Routing follows the approved EMC layout; crossings are minimized and made close to 90° where needed. | Power and signal routes separated; one perpendicular crossing recorded. | Pass |
| Cable-shield termination | Check shield clamps and connector backshells at enclosure entries; verify the specified 360-degree termination is maintained. | Shield contact is continuous and broad, with no unintended long pigtail connection at the entry point. | 360-degree clamp fitted; contact surface clean and secure. | Pass |
| Conducted emissions | Measure disturbance at the AC power port using a line impedance stabilization network over 150 kHz–30 MHz. | Results remain below the applicable conducted-emission limits for the product and installation category. | Worst-case margin: 6 dB below the applicable limit. | Pass |
| Radiated emissions | Measure emissions in a calibrated test setup over the frequency range specified by the applicable standard and test plan. | Measured field strength remains below the applicable limit with the final cable lengths and operating modes represented. | Worst-case margin: 4 dB below the applicable limit. | Pass |
| Electrical fast transient (EFT) | Apply the project-defined EFT burst test to relevant power and signal ports while monitoring operation. | No loss of function beyond the performance criterion agreed for the equipment; normal operation is maintained or restored as specified. | Tested at the planned port levels; no unintended reset or data loss observed. | Pass |
| Surge immunity | Apply the planned surge waveform and coupling mode to applicable ports, with the equipment in representative operating states. | Performance meets the agreed criterion at the selected test levels; no unsafe condition or permanent damage occurs. | No permanent damage; operation recovered within the specified criterion. | Pass |
| Final installation retest | Repeat functional checks and selected EMC measurements after enclosure closure, final grounding, and connection of representative field cables. | Results remain consistent with the approved test configuration and acceptance criteria; deviations are documented and resolved. | No new functional issues; final configuration and cable schedule recorded. | Pass |