| Quality management system | Confirm that the manufacturing site has a documented, maintained quality system appropriate to the application. ISO 9001 certification addresses the quality management system; it does not by itself certify a particular resistor design or guarantee product performance. | Current certificate, certification scope, covered site and processes, audit status, and procedures for corrective action and nonconforming product. | Check that the certificate applies to the actual production location and relevant manufacturing activities, not only to a head office or unrelated site. |
| Industry-specific requirements | For automotive programs, determine whether the customer requires an automotive quality system, such as IATF 16949, or specific customer approval processes. Requirements depend on the application and customer. | Applicable certificates, customer-specific requirements, process audit results, and agreed approval documents such as PPAP when required. | Ask which requirements are included in the quotation and quality agreement; do not assume that a certificate or PPAP is required for every resistor purchase. |
| Product specification and standards | Ensure the drawing and datasheet define resistance, tolerance, temperature coefficient of resistance (TCR), rated power, maximum working voltage, operating temperature, construction, and termination details. IEC 60115-1 is a generic specification for fixed resistors used in electronic equipment. | Controlled datasheet, approved drawing, material and construction details, and a clear revision history. | Resolve ambiguous terms and identify test conditions, units, limits, and acceptance criteria before approving samples or production. |
| Electrical and measurement testing | Review how resistance, TCR, power handling, voltage, and any pulse or overload requirements are measured. Test conditions should match the agreed specification and intended use. | Sample test reports, equipment calibration records, measurement methods, test limits, and measurement uncertainty where relevant. | Confirm that the report identifies the tested sample, specification revision, test conditions, results, and pass/fail criteria. |
| Laboratory competence | For tests requiring independent or specialized laboratory work, check whether the laboratory is competent for the specific method. ISO/IEC 17025 concerns the competence of testing and calibration laboratories. | Laboratory accreditation scope, test method, calibration traceability, and the laboratory’s report for the relevant test. | Verify that the requested test is within the laboratory’s accredited scope; accreditation for other methods does not automatically cover it. |
| Reliability and qualification testing | Select stress tests based on the resistor technology and application. Depending on the design, these may include load-life, temperature cycling, humidity exposure, solderability, or pulse testing. AEC-Q200 is a stress-test qualification framework for passive components used in automotive applications. | Qualification plan, sample identification, methods and conditions, results, failure analysis, and evidence that the tested construction matches the proposed product. | Agree on required tests and acceptance limits in advance. Do not treat a component-family qualification as automatic qualification of every custom design or application. |
| Process control and traceability | Assess controls for incoming materials, production steps, inspection, lot identification, nonconformance handling, and corrective action. | Process flow, control plan, inspection records, lot traceability procedure, corrective-action examples, and retention policy for quality records. | Ask how a delivered lot can be traced to production and material records, and how the supplier will investigate and contain a reported defect. |
| Regulatory and material compliance | Identify the regulations applicable to the destination market and product. For EU-market products, assess applicable RoHS restrictions and REACH obligations, including relevant substance declarations and updates. | Current material declaration, supporting test or supplier documentation where appropriate, and a process for monitoring regulatory changes. | Specify the required declaration format, product scope, and update frequency; verify that documentation refers to the quoted material and construction. |
| Engineering changes and production consistency | Check how changes to materials, processes, tooling, manufacturing location, or test methods are reviewed and communicated. | Documented change-control procedure, customer notification rules, requalification criteria, and product revision records. | Agree in writing which changes require prior notification, customer approval, or renewed qualification before implementation. |
| Sampling and acceptance criteria | Define incoming inspection, lot acceptance, and any sampling plan according to risk, volume, and customer requirements. AQL values and sampling methods should be agreed rather than assumed to be universal. | Inspection plan, sampling method, defect classifications, acceptance limits, and certificate of conformance if required. | Put the sampling standard, inspection scope, and disposition process for rejected lots into the purchase specification or quality agreement. |