| 1 | Rated flow and total head | 15% | Check that the proposed pump meets the required flow and total dynamic head at the specified operating point, including the system’s static and friction losses. | Pump curve with the required duty point marked; stated flow, head, speed, and impeller diameter. | _____ / 5 |
| 2 | Hydraulic performance verification | 12% | Compare the guaranteed performance and the test acceptance criteria. ISO 9906 specifies acceptance tests for rotodynamic pump hydraulic performance; agree the applicable grade and tolerances in the purchase contract. | Factory performance test report showing measured flow, head, power, speed, test method, and acceptance criteria. | _____ / 5 |
| 3 | NPSH and cavitation suitability | 12% | Compare the pump’s NPSH required (commonly reported as NPSH3) with the system’s available NPSH at the actual condensate temperature, pressure, liquid level, and flow. Establish the required margin for the application. | NPSH curve and a documented system NPSH calculation using the buyer’s operating conditions. | _____ / 5 |
| 4 | Temperature and pressure limits | 10% | Verify allowable liquid temperature, operating pressure, casing pressure rating, and any limits on starts, stops, or thermal cycling against the complete system design. | Published operating limits and a proposal confirming suitability for the specified maximum and normal conditions. | _____ / 5 |
| 5 | Wetted materials and corrosion compatibility | 10% | Check casing, impeller, shaft, and wear components against condensate chemistry, temperature, oxygen exposure, and any treatment chemicals. Material suitability depends on the actual service conditions. | Bill of materials, material grades, and written confirmation of compatibility with the buyer’s condensate specification. | _____ / 5 |
| 6 | Pump configuration and installation fit | 8% | Compare horizontal or vertical arrangement, suction conditions, footprint, nozzle orientation, maintenance access, and compatibility with the condensate receiver or tank layout. | General arrangement drawing, foundation and nozzle details, and installation-clearance requirements. | _____ / 5 |
| 7 | Motor and electrical compatibility | 8% | Confirm motor power, voltage, frequency, phase, enclosure, insulation, and starting method match the site supply and operating plan. Check motor rating against absorbed pump power over the required operating range. | Motor datasheet, nameplate details, wiring diagram, and confirmation of the applicable IEC 60034 requirements where specified. | _____ / 5 |
| 8 | Shaft sealing and leakage management | 8% | Compare the proposed seal arrangement and materials with condensate temperature, pressure, operating frequency, and site maintenance preferences. Define acceptable leakage and monitoring requirements. | Seal datasheet, operating limits, flushing or cooling requirements, and recommended inspection intervals. | _____ / 5 |
| 9 | Quality records and traceability | 9% | Assess whether manufacturing and inspection records meet the project specification, including traceability of critical parts and inspection hold points where required. | Quality plan, inspection and test plan, material certificates, dimensional inspection records, and agreed test documentation. | _____ / 5 |
| 10 | Service, spares, and delivery support | 8% | Compare quoted lead time, warranty terms, local technical support, spare-parts availability, and the response process for commissioning or troubleshooting. | Written delivery schedule, warranty terms, recommended spares list, and service-support contact and response commitments. | _____ / 5 |