| Boiler capacity and operating pressure | Rated steam output, design pressure, normal operating pressure, and turndown range. Confirm whether output is stated for saturated or superheated steam. | Technical datasheet, performance curves, and a written operating-point proposal based on the required steam conditions. | A boiler should be selected for the actual steam demand and pressure, not only its maximum advertised capacity. |
| Efficiency and test basis | Compare quoted efficiency at the same load, fuel composition, feedwater temperature, and measurement method. Check whether the figure uses higher heating value (HHV) or lower heating value (LHV). | Test report or calculation sheet stating the efficiency method, operating conditions, and whether auxiliary power is included. | Efficiency figures based on different heating-value conventions or test conditions are not directly comparable. |
| Fuel and burner compatibility | Confirm the permitted natural-gas pressure and composition range, burner control method, ignition system, and any backup-fuel capability. | Burner specifications, fuel requirements, control sequence, and documentation for the proposed burner-boiler combination. | Gas supply conditions and fuel characteristics affect combustion stability, output, and emissions. |
| Emissions performance | Compare stated nitrogen oxides (NOx) and carbon monoxide (CO) levels at the required firing rate and under the applicable local measurement conditions. | Emissions test results, test conditions, and details of any low-NOx burner or flue-gas treatment included in the offer. | Permitted emission limits depend on the installation location and applicable regulations; verify requirements with the local authority. |
| Pressure-vessel code and market compliance | Identify the design and construction code required for the destination market and the specific boiler category. | Applicable code documentation, nameplate details, inspection records, and conformity documents required for the project. | Requirements vary by jurisdiction and boiler classification. For example, ASME BPVC provisions, European pressure-equipment requirements, or local rules may apply; confirm the correct route for the installation. |
| Management-system certifications | Check the scope, issuing body, validity, and manufacturing site covered by any quality-management certification. | Current certificate and confirmation that its scope covers the relevant manufacturing activities. | A management-system certificate, such as ISO 9001, concerns a management system; it does not by itself certify a particular boiler design or prove its performance. |
| Materials, fabrication, and inspection | Review pressure-part material traceability, welding procedures, welder qualifications, non-destructive examination, and inspection hold points. | Material certificates, welding and inspection records, quality plan, and final inspection documentation appropriate to the applicable code. | Traceable materials and documented fabrication controls help demonstrate that pressure parts were manufactured and inspected as specified. |
| Controls and safety functions | Compare burner management, flame-failure protection, pressure and water-level protection, alarms, interlocks, and control-panel interface. | Control-system description, cause-and-effect list, wiring diagrams, and commissioning test procedures. | Safety functions and control integration should suit the boiler design, plant operating procedures, and applicable regulations. |
| Water treatment and auxiliaries | Clarify feedwater quality limits and the scope of pumps, deaeration, water treatment, blowdown, economizer, and other auxiliaries. | Water-quality requirements, equipment list, utility schedule, and battery-limit drawing. | Water quality and auxiliary equipment affect reliability, maintenance needs, and the overall efficiency of the steam system. |
| Factory testing and commissioning | Confirm factory acceptance testing, site installation support, combustion adjustment, performance verification, and operator training. | Inspection and test plan, commissioning scope, acceptance criteria, and training schedule. | Clear test criteria and defined responsibilities reduce ambiguity during delivery, installation, and handover. |
| Warranty and after-sales service | Compare warranty duration and coverage, exclusions, spare-parts availability, technical response arrangements, and service coverage at the installation site. | Written warranty terms, recommended spare-parts list, service contact process, and a support plan for the destination country. | Support arrangements should be practical for the site’s location and operating schedule; verify commitments in the contract. |
| Commercial scope and lifecycle cost | Compare included equipment, exclusions, shipping terms, installation interfaces, consumables, maintenance requirements, and expected operating costs. | Itemized quotation, scope-of-supply list, utility consumption data, and documented assumptions. | A purchase price alone does not show the total cost of owning and operating a boiler over its service life. |