| 1 | Material identification | Confirm that the belt is polypropylene (PP), and identify whether it is unfilled PP or a modified compound. Typical unfilled PP resin density is approximately 0.90–0.91 g/cm³; additives and construction can change measured values. | Material specification, technical data sheet, and batch or resin traceability information. | Check that the material description applies to the belt itself, not just a coating or one component. |
| 2 | Width, thickness, and length | Provide the machine drawing or measured dimensions, including belt width, thickness, overall length, and any required edge or joint details. Agree dimensional tolerances for the order. | Dimensioned drawing, written tolerance schedule, and inspection record for the supplied roll or belt. | Confirm that dimensions suit the rollers, supports, scrapers, and available tracking adjustment on your equipment. |
| 3 | Tensile properties and elongation | Set minimum tensile and elongation requirements for the complete belt construction and intended load. ISO 527 is a recognized method for determining tensile properties of plastics; results depend on specimen preparation and test conditions. | Test report stating the method, specimen, test direction, conditioning, and results; ask whether results describe resin samples or finished belt material. | Compare test results with the supplier’s written guaranteed values and your equipment’s belt-load requirements. |
| 4 | Joint and edge quality | Specify the joint type, joint location, edge finish, and any restrictions on protrusions or surface steps. The suitable joint depends on belt design and the machine’s installation method. | Joint drawing or sample, manufacturing procedure, and inspection criteria for the finished joint. | Inspect a sample for separation, uneven edges, and surface irregularities that could interfere with tracking or manure removal. |
| 5 | Temperature and chemical exposure | List operating, storage, and cleaning temperatures, plus exposure to detergents or other chemicals. PP commonly has a melting range around 160–170°C, but melting temperature is not a continuous-use temperature rating. | Supplier’s temperature limits and compatibility guidance for the actual belt construction and cleaning products. | Ask the supplier to confirm suitability at your actual operating conditions, not merely by citing PP’s melting range. |
| 6 | UV and environmental exposure | State whether belts are exposed to sunlight, washdown, or outdoor storage. If UV exposure is relevant, request details of UV stabilization and the supplier’s supported service-life conditions. ISO 4892-3 covers laboratory exposure of plastics using fluorescent UV lamps. | UV-stabilization specification and, where available, a test report that identifies the exposure method and assessment criteria. | Treat accelerated exposure results as comparative test data, not a guaranteed conversion to years in service unless the supplier provides a validated basis. |
| 7 | Load, support, and tracking | Share belt span, support spacing, drive arrangement, expected manure load, operating speed, and scraper configuration. Confirm that the proposed belt construction is suitable for the complete conveyor setup. | Written application review, installation guidance, and operating limits relevant to your equipment configuration. | Check belt tension and tracking during a supervised trial under representative operating conditions. |
| 8 | Surface and cleanability | Define the required surface finish and cleaning method. PP has low moisture absorption compared with many common plastics, but surface finish, belt construction, and contamination affect cleaning performance. | Finished-belt sample, surface description, and cleaning recommendations for the intended system. | Evaluate residue removal and scraper contact using your cleaning procedure and representative material. |
| 9 | Quality control and traceability | Check how the supplier controls incoming material, production dimensions, joints, and finished-belt inspection. Confirm how defects and production batches are identified. | Inspection plan, sample quality record, batch identification method, and documented process for handling nonconforming product. | Prefer records tied to the supplied batch and the agreed purchase specification. |
| 10 | Samples, delivery, and after-sales terms | Agree sample availability, production lead time, order quantity, packing, delivery terms, warranty scope, and the process for reporting a failure. | Written quotation, delivery schedule, warranty terms, and a documented claims process. | Where practical, approve a sample or pilot installation before placing a larger order. |